# About Quartz Countertops Toronto | Since 2008

> Caesarstone + Cambria authorized Toronto fabricator since 2008. 1,800+ GTA kitchens. Red Seal, TSSA, $5M, WSIB.

URL: https://quartzcountertopstoronto.ca/about/

![Our Toronto stone fabrication shop floor with CNC equipment and quartz slabs](/images/misc/wide-view-of-a-bright-toronto-stone-fabrication-sh.webp)

About Us

# Toronto Quartz Countertop Fabricators Since 2008

Quartz countertops have been our trade in Toronto since 2008, from Leaside kitchens to Queen West restaurants. We are Caesarstone and Cambria authorized, we cut every slab in our own 20,000 sqft shop and we publish our prices before you pay a cent.

17+

17+ Yrs Fab

Toronto and GTA

1.8K

1,800+ Kitchens

400+ bathrooms too

CS

Caesarstone Authorized

Cambria since 2010

15Y

15-Yr Warranty

Transferable 5 yrs

$5M

$5M Liability

TSSA + NSF installs

WSIB

WSIB Covered

Certificates on request

Our Story

## 17+ Years Fabricating Countertops in the GTA

We started in 2008 with a simple idea: a countertop should fit the first time, and the price you are quoted should be the price you pay. Since then we have fabricated and installed more than 1,800 kitchens and 400 bathrooms across Toronto, North York, Scarborough, Etobicoke, East York, Mississauga, Vaughan, Markham, Richmond Hill and Oakville.

In 2010 we became an authorized fabricator for both Caesarstone and Cambria. That direct relationship lets us match the sample board you approve to the slab yardage we order, which removes the dye-lot drift that frustrates so many quartz buyers.

Today everything happens in our 20,000 sqft Toronto facility: CNC bridge saws, a waterjet, CNC edge profilers and wet-cutting dust control. We template with Proliner lasers to 1/16th inch, and only after your cabinets are installed. We publish per-sqft pricing before any deposit and tie payments to measurable work: 25% at templating, 50% at fabrication start and 25% after you walk the finished counter.

![CNC edge profiler polishing a mitred quartz edge in our workshop](/images/misc/cnc-edge-profiler-polishing-the-mitred-edge-of-a-w.webp) ![Finished Caesarstone quartz waterfall island in a Toronto home](/images/misc/finished-caesarstone-quartz-kitchen-island-with-wa.webp)

Meet Our Team

## Red Seal Fabrication Leadership

![David Lam, Owner and Fabrication Lead](/images/squares/professional-headshot-of-a-toronto-countertop-fabr.webp)

### David Lam

Owner and Fabrication Lead

David Lam is the owner and fabrication lead at Quartz Countertops Toronto and a Red Seal Certified countertop fabricator since 2008. He trained on CNC bridge saws and waterjet cutting at Caesarstone's Toronto distribution facility and reviews every slab before it is installed across Toronto and the GTA.

-   Red Seal Certified Countertop Fabricator
-   Caesarstone + Cambria Authorized Fabricator (since 2010)
-   CNC bridge saw and waterjet training, Caesarstone Toronto distribution facility

Behind David is a team of templaters, CNC operators and WSIB-covered install crews who handle every job from first visit to walk-through.

Credentials

## Authorizations, Insurance and Standards

Ask for any certificate. Property managers and general contractors get them before we start.

-   Caesarstone Authorized Direct account since 2010
-   Cambria Authorized Direct account since 2010
-   Red Seal Certified fabrication lead
-   TSSA Compliant installs
-   WSIB Covered crews
-   $5M liability Certificates on request
-   NSF-certified installs Food service and healthcare

How We Work

## Four Rules We Do Not Break

### We template only after cabinets are set

Cabinets installed and level, sinks on site, backsplash walls finished. An early template is the top cause of re-fits.

### Seams go where you cannot see them

Behind the range, at an inside corner or along the island edge, written into a seam plan you sign.

### Every overhang over 10 inches gets steel

Recessed brackets in the cabinet rail, invisible from below, listed on your quote.

### Prices before deposits

Published per-sqft tiers and a 25/50/25 payment schedule tied to work you can see.

## Numbers Behind Every Toronto Install

Years fabricating in the GTA

17+

Kitchens installed

1,800+

Bathrooms completed

400+

Sq ft in-house CNC shop

20,000

Proliner templating accuracy

1/16 in

Workmanship warranty

15 yr

Brands we fabricate and standards we work to

-   Caesarstone Authorized since 2010
-   Cambria Authorized since 2010
-   Silestone Cosentino HybriQ+
-   Hanstone Engineered quartz
-   NSF NSF/ANSI 51 installs
-   TSSA Compliant
-   Red Seal Fabrication lead
-   WSIB Covered crews

![](/images/hero/quartz-slab-being-inspected-under-bright-shop-ligh.webp)

CAD estimate within 1-2 business days

## Talk to a Red Seal Fabricator About Your Project

CAD estimate within 1-2 business days. No consultation deposit.

Get a Free CAD Quote

[/contact/#quote-form →](/contact/#quote-form)

 

Call (416) 000-0000

[tel:+14160000000 →](tel:+14160000000)

-   Per-sqft pricing before deposit
-   25/50/25 payment
-   15-yr transferable warranty
